[caption id="attachment_4711" align="alignright" width="300"] Image created using Bit Strips.[/caption] With French done, I have a lot of other things to catch up on. It seems like I have Mount Everest ahead of me, but I'm just going through the list one at a time. I've gotten a couple of things done and some started. Renovations Before the weekend, my new kitchen floor was installed. After the credits that Jiffy gave me, install cost less than $40. The old floor was light grey peel and stick tile, which was peeling itself up on the edges. Because I couldn't get all the glue up from the floor underneath the peel and stick, I needed to put new floor in. Oh, I started peeling it up with a hair dryer. I really don't recommend that. It doesn't get hot enough to work well. It was taking around 20 minutes each tile with the hair dryer. With a proper heat gun, a couple hours for the whole floor. Old floors: [gallery ids="9630,9631" ...